- Daily Update of Project / Operation Progress to immediate superior. - To have and maintain good daily attendance and punctuality. - To update team member at least 2 working days in advance before going for leave , in order to minimize downtime - Able to manage and supervision to 30 (3 foreman)pax of workforce . - Manage and monitor the foreman and workers for right attitude , behaviour and manner working at sites . - Ensure and understanding in detail Scope of Work, Specifications , Basic Design and project schedule milestones. - Ensure and understanding in detail ISO & layout drawings , P&ID drawings and vendor drawings. - Read the MSRA for each activities and briefing to all work force before start work. - Read the ITP ( Inspection and Test Plan ) and make sure construction quality is met. - Plan the materials requirement and coordinate with project procurement engineer. - Attend the project safety site walks and actively involve in safety improvements . - Check and monitor the FS ( Field Change Sheet/Design Change ) drawings and update to Project Engineer for additional claims . - Conduct daily and weekly site construction meeting with team - Check the project required mandatory courses for piping crew and arrange for training in line with training matrix - Coordinate with respective trainer and arrange the RFU trainings for each activity and monitor the training records - Check and prepared the MTO and manhour for additional works, update to project engineer for VO (variation order ) claim. - Ensure the daily PTW for all work activities shall be covered by PTW system - Check and ensure all site activates shall ongoing well with quality and safety . - Plan and prepare minimum One week in advance Manpower, Material, Machinery as per given task. - Prepare min 3 days in advance DWI to delegate to individual crew. - Work Progress Update And Mitigation Plan Discussing In Daily Toolbox Meetings and Weekly Meetings. - Monitor and Daily update for piping work status to Field Engineer. - Manage & co-ordination of the subcontractors engaged in project at field side - Check the integrity construction tools and equipments and arrange the service as required. - Update feedback to construction superintendent for the site piping activities regularly. Job Type: Contract Education:
Local Polytechnic Diploma (Preferred)
Experience:
MECHANICAL: 2 years (Preferred)
Piping: 3 years (Preferred)
Piping supervisor: 2 years (Preferred)
Beware of fraud agents! do not pay money to get a job
MNCJobz.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.