Req ID:484864
At Alstom, we understand transport networks and what moves people. From high-speed trains, metros, monorails, and trams, to turnkey systems, services, infrastructure, signalling and digital mobility, we offer our diverse customers the broadest portfolio in the industry. Every day, more than 80 000 colleagues lead the way to greener and smarter mobility worldwide, connecting cities as we reduce carbon and replace cars.
INTRODUCTION
ThomsonEast Coast line (TEL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore that is currently under construction, being the sixth line to be built. The line was announced on 15 August 2014 by the Land Transport Authority. The fully underground line is 43 km long and consists of 31 stations, 2 Operation Control Centres (OCC), 2 Depots, and will be among the world's longest driverless rapid transit lines. The line is open in multiple stages with Stage 4 open for Revenue Service from June 2024 and Stage 5 in progress and it is operated by Singapore Mass Rapid Transit (SMRT). A complex and challenging project, Alstom will design, supply, install and commission the signaling Urbalis 400 Communications-based train control (CBTC) system and platform screen doors for Thomson Line. There is extensions planned for this line in future.
OVERALL PURPOSE OF THE ROLE:
Lead the ATS Team onshore and offshore to develop and deliver the Automatic Train Supervision (ATS) Subsystem in line with the Project Roadmap. ICC Leader role combines a leadership role with a technical one, mainly because he/she is the technical leader of the ATS engineering Team and at the same time, responsible for the close coordination with the Custormer, Project teams, System teams and ATS Subsystem team.
RESPONSIBILITIES:
MNCJobz.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.