Senior Manager Mechanical Engineering (data Centre Construction)

Singapore, Singapore

Job Description

Our client is a global leader in providing engineering solutions for high-tech ultra-
clean and sustainable facilities. It is seeking to employ an experienced
professional to join them as
Senior Manager - Mechanical Engineering (Data Centre
Construction) (Ref: KHXXXX)
The successful candidate is expected to perform engineering tasks towards the
completion of the data centre project
.
The Job
? Perform engineering tasks for the design and construction of data centre
facilities
? Design electrical systems and prepare mechanical engineering calculations
and deliverables in support of mechanical systems designs
? Coordinate with disciplines in the preparation and development of the
deliverables and ensure their inputs are incorporated
? Provide specialized technical input to studies and all relevant technical
documentation
? Provide construction input for design engineering suitability and control
? Manpower and scheduling
? Estimating support
? Bid evaluation and purchasing of major equipment
? Preparation of contract requisition to award
? Responsible for mechanical installation performance, schedule, budget,
safety and commissioning
? Review documentations submitted by vendor and ensure that all comments
are incorporated to meet the design intent of the system for the project
? Release/approval key deliverables for procurement and construction
purposes
? Co-ordinate changes as required
? Perform quality control review of design calculations or drawings
The Candidate
? Bachelor's degree in Mechanical Engineer (or similar experience and
qualification) preferably with professional registration
? 5+ years working in mechanical engineering
? Minimum 5 years of Data Centre experience
? 2+ years' experience in Asia (NEA or SEA)
? Experience of working with international companies
? Experience dealing with multi-discipline design teams
? LEED / BREEAM Certification experience
? Technical knowledge and understanding of all stages of Engineering Design
and Construction for Mechanical systems from Preliminary Design to
Commissioning and Handover
? Technical knowledge and understanding of project execution processes in a
fast-track environment
? Extensive local construction knowledge including knowledge of local codes
and regulations for design implementation
Interested professionals are to submit their applications and CVs in MS Word
format stating current and expected salary packages to
kh.tan@jondavidsongroup.com as an expression of their interest. We regret that
only short-listed candidates will be notified.

Skills Required

Beware of fraud agents! do not pay money to get a job

MNCJobz.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.


Job Detail

  • Job Id
    JD1617441
  • Industry
    Not mentioned
  • Total Positions
    1
  • Job Type:
    Full Time
  • Salary:
    Not mentioned
  • Employment Status
    Permanent
  • Job Location
    Singapore, Singapore
  • Education
    Not mentioned