The role of the inspector is to help PUB protect underground sewers (i.e. pipes that transport wastewater) from being damaged by construction activities.
Report to the construction site mentioned in the Sewerage Information Plan (SIP) and Interpret the SIP for the construction project, locate the manholes and public sewers within the land parcel(s) of the construction project to determine the location of the construction site/activity, and take photos at each manhole and along the sewer alignment to show the absence/presence of construction activities within sewer corridor. * Ensure that the contractors are holding the relevant approval to carry out the activity nearer to the sewer line
Prepare inspection report in PowerPoint with a given template, the report shall include coloured photos labelled with (i) manhole ID, (ii) arrows that indicate the direction of sewer alignment, (iii) details of the construction activities and machinery observed on site near the sewers.