Responsible to study the project requirement, specification and follow by document submission such as Method statement as required.
Attend periodical meetings with clients to discuss engineering clarification and engineering status:
Technical Query (TQR)
Piping Insulation Document & Drawing Status (isometric drawings, P&ID's, Piping GA's, etc.)
FIM & HOS supply piping material status
Engineering Clarification / Proposal
Responsible for the master material take off (MTO), procurement of insulation materials and expediting materials to be delivered on time.
Responsible for master status of Engineering, Procurement and construction status.
Coordinate with fabricator and project team for the execution of insulation work.
Preparation of necessary document for additional claim / instruction to sub-contractor (JCS / JCR / Site Instruction / Timesheet "A" and "AA").
Study and understand project spec, scope of work and scope of supply.
Ensure that subordinates are trained and knowledgeable of specifications and work procedures, to ensure optimum efficiency, and work is being performed in conformance with specified quality requirements.
Establish sequence of priority system for piping completion with related section, ensure work and materials are planned in accordance with the same sequence.
Requirement:
Degree/Diploma in Mechanical Engineering or equivalent
Experience in marine oil and gas industry
Job Types: Full-time, Permanent
Work Location: In person
Beware of fraud agents! do not pay money to get a job
MNCJobz.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.