Req ID:422856
We create smart innovations to meet the mobility challenges of today and tomorrow. We design and manufacture a complete range of transportation systems, from high-speed trains to electric buses and driverless trains, as well as infrastructure, signalling and digital mobility solutions. Joining us means joining a truly global community of more than 38 900 people dedicated to solving real-world mobility challenges and achieving international projects with sustainable local impact.
INTRODUCTION
Thomson-East Coast line (TEL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore that is currently under construction, being the sixth line to be built. The line was announced on 15 August 2014 by the Land Transport Authority. The fully underground line is 43 km long and consists of 31 stations, 2 Operation Control Center (OCC), 2 Depots, and will be among the world\'s longest driverless rapid transit lines. The line will open in five stages from 2019 onwards and will be operated by Singapore Mass Rapid Transit (SMRT).
Under T252 contract, Alstom will design, supply, install and commission the signaling Urbalis 400 Communications-based train control (CBTC) system and platform screen doors for Thomson Line. TEL is a complex and challenging project for which Alstom as System Wide Contractor (SWC) needs to interface with other 40 SWCs, 35 Civil Works and 5 A/E consultants.
OVERALL PURPOSE OF THE ROLE:
MNCJobz.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.