At Alstom, we understand transport networks and what moves people. From high-speed trains, metros, monorails, and trams, to turnkey systems, services, infrastructure, signalling and digital mobility, we offer our diverse customers the broadest portfolio in the industry. Every day, more than 80 000 colleagues lead the way to greener and smarter mobility worldwide, connecting cities as we reduce carbon and replace cars.INTRODUCTIONThomson-East Coast line (TEL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore that is currently under construction, being the sixth line to be built. The line was announced on 15 August 2014 by the Land Transport Authority. The fully underground line is 43 km long and consists of 31 stations, 2 Operation Control Center (OCC), 2 Depots, and will be among the world\'s longest driverless rapid transit lines. The line will open in five stages from 2019 onwards and will be operated by Singapore Mass Rapid Transit (SMRT).Under T252 contract, Alstom will design, supply, install and commission the signaling Urbalis 400 Communications-based train control (CBTC) system and platform screen doors for Thomson Line. TEL is a complex and challenging project for which Alstom as System Wide Contractor (SWC) needs to interface with other 40 SWCs, 35 Civil Works and 5 A/E consultants.OVERALL PURPOSE OF THE ROLE:
MNCJobz.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.